Per Arne Moen
Address:
���������������Seljeholtet
5b, 1344
Phone.: ���������������� +47-918-41041
E-mail: ���������������� pam@jbv.no
Website:��������������� www.tunnelandgeoconsult.com
Name������������������������������������� :���������� MOEN, Per Arne
Job Title/Profession���������������� : ��������� Civil
Engineer, rock mechanics
Born��������������������������������������� :
��������� 1959
Nationality������������������������������ :
��������� Norwegian
Languages������������������������������ :
��������� English (good),
Assignments in ����������������������� :
���������
Key
Qualifications:
-
Construction
site management.
-
Advisor
for tunnelling and underground projects. �
-
Geological
and rock engineering. �
-
Pre-investigations
and geological field surveys.
-
Digitalized
design drawings and follow-up during construction.
-
Permanent
rock support of tunnels and caverns.
-
Systematic
pre-grouting programs to meet environmental demands
Hydroelectric plants, sub-sea tunnels and
underground storage plants.
TBM machine
performance and influence of geological rock conditions on TBM
drilling.�
Slim hole directional
drilling for pre-investigations and oil exploration.
Education:
1985��� : MSc Engineering Geology, University of Science and Technology, Trondheim
Other
Training:
Courses in CAD construction Microstation
(1995) and AutoCAD (1990)
Courses in engineering site construction
(1986), and rock mechanics (1986) at the
Petroleum technology; drill hole stability analysis
(2001),
Experience
Record:
1997-
present: ��������� TUNNEL & GEOCONSULT (Own
consultant company)
�
Site management, geology and
rock mechanics. Site supervision and rock support of tunnels and caverns.
2002-present:
���������� JERNBANEVERKET,
Norwegian Railroad Authorities
Consultant; Assistant Superintendent,
Rock Works.
�
Double track railroad tunnel,
3.7 km, Sandvika � Asker,
Consultant, directional
drilling.
�
Establishing of a
directional drilling group in SRG/ AF-gruppen in cooperation with Devico
as,
2000-2001:���� ���������� SINGAPORE
MINISTRY OF DEFENCE
Seconded by NorConsult
as: Technical advisor, rock mechanics (July �00 to January -01)
�
Underground construction in
2000:
�
1997-1999:
��������������� Statens
Vegvesen Hordaland,
Department of Road and Communication
Consultant
and Site Geologist
�
The B�mlafjord
sub sea tunnel. Length 7.8 km. Site geologist. Site supervision, geological
follow up and permanent rock support of Norway�s until then deepest sub sea
tunnel (260 meter below sea level (see article in Tunnels & Tunneling March 2000)).
�
Song Hinh
Hydropower
Site investigations and meetings with client in
1995-1997:
��������������� NCC,
Chief Geoengineer,
�
The Arlanda
Railroad Tunnel Project - Tunnels and caverns under Arlanda
international airport (800,000 m3 rock excavation). Complicated
excavation with wide spans and low rock cover under existing airport
constructions. Leader of NCC�s geo-department, (4
geologists and 1 Cad operator). Member of the monthly rock mechanical expert
team (Prof.Ph.D. H. Stille;
KTH, Dr.Ph.D. A. Palmstr�m; Norconsult as). Follow
up of the rock mechanical test program; convergence and extensometer
installations in tunnels and elevation measurements on surface. Geological
databases with daily updates and electronic distribution to all construction
sites (15 faces) of rock conditions and rock support recommendations. See article from
Arlandabanan in �Fjellsprengningskonferansen, Oslo -96�.
1991-1994:���� ����������� SAUDI
STRATEGIC STORAGE PROJECT (SSSP)
ABV Rock Group KB,
Site Geo Engineer.
�
Site supervision and decision of permanent rock
support. CAD design of construction drawings. (Rock excavation: 4.3 mill m3,
construction sites: 32 faces). Head of Site Geo Engineering department of 5
engineers, 2 CAD operators and 3 technicians between 1991 and 1994. Member of
the bi-weekly rock mechanical expert team (Dr.PhD O.T.Blindheim, Dr.PhD O.Siegl and others).
�
ABV Rock Group,
�
ABV Rock Group,
1987
-91: ������ ����������� NORWEGIAN STATE POWER COMPANY (Statkraft)
Senior Engineer/Site Geologist
�
Permanent rock support of
the Svartisen Hydro Power Plant tunnels and caverns.
Design of all tunnels and caverns in computer CAD system. Geological field
survey of the head race tunnel of the coming Melfjord
Hydropower Plant. Pre-investigation
of sub-glacial water intakes.
�
Svartisen Hydro Power Plant: Complete geological mapping of the coming Svartisen headrace tunnel, project leader. Geological field
surveys of the minor water tunnels. Total length 100 km. Supervisor of rock
support and excavation in tunnels and caverns.
�
Jostedal Hydro Power Plant: Trainee, shift supervisor on dam construction, open
pits and tunnels, site geo engineer.
1985-1986:���� ����������� NTH,
NORWEGIAN
Scientific Assistant in
engineering geology and teaching student classes.
�
Project 8-87; "Deep Sea
Fjordcrossing". Project assistant. Division of Construction
Engineering.
1985:�� ����������������������� IKU,
Field engineer
�
Oil exploration drilling, Barent Sea. Geological mapping, core logging and seismic
evaluation of offshore drillholes on the Loppa Ridge,
END CV
Per Arne Moen