Our company has 15 years on site experience in geological follow up of large scale underground projects in hard rock. Rock excavation is continuously followed up and classified according to the norwegian NGI's Q-system (Rock classification system). Accordingly the permanent rock support for each tunnel or cavern sequence is decided and installed imediately after rock excavation.
Our CAD operator is designing base drawings of the tunnel sequences for the on site work. These are again completed by our engineering geologist on site and form the base for the daily and weekly reports on permanent rock support to be installed by the Contractor. In this way the Client also has the full control of the amount of permanent support ordered and the distribution of the rock conditions. (See example in ref. project no.4; B�mlafjord)
REFERENCE PROJECTS:
Contact us:
Tunnel & GeoConsult See CV: ,
Our company is also involved in the fast growing trenchless business and is today working with several
projects in directional drilling in arctic Spitsbergen and mainland Norway.
Cooperative partners in directional drilling: SRG, Norway,
Devico, Norway, and Geological Boring, Seattle.